Home > Blog > How to install a welding column boom
2024-11-29

How to install a welding column boom

Installing a welding column and boom requires careful planning and adherence to safety guidelines due to the heavy and complex equipment involved. Here’s a step-by-step guide to help you set it up:

Welding column boom installation

welding column and boom

1. Prepare the Installation Site

Choose a location: Select a flat, stable surface in a well-ventilated area with enough clearance for the boom's full range of movement.

Check load-bearing requirements: Ensure the floor can support the weight of the column, boom, and any additional attachments or equipment.

2. Gather Equipment and Tools

Lifting equipment: You’ll need a crane or forklift to position heavy components.

Anchor bolts and baseplate: These secure the column to the floor.

Safety gear: Hard hats, gloves, steel-toed boots, and eye protection.

Hand tools: Wrenches, sockets, level, measuring tape, and a torque wrench.

3. Position and Anchor the Column

Mark the foundation: Measure and mark where the anchor bolts will go, making sure it aligns with the column baseplate.

Drill anchor holes: Use a heavy-duty drill to make holes for the anchor bolts.

Lift and align the column: Use a crane or forklift to position the column over the anchor bolts.

Secure the column: Fasten the baseplate to the floor using anchor bolts, tightening them to the recommended torque.

4. Attach the Boom to the Column

Position the boom: Carefully align the boom with the mounting bracket on the column.

Secure with bolts: Attach the boom to the column with heavy-duty bolts, and tighten to the manufacturer’s specifications.

Check for alignment: Use a level to ensure the boom is properly aligned with the column.

welding column and boom

5. Install Electrical and Pneumatic Connections

Connect wiring: Ensure the column-boom assembly has the necessary electrical wiring for controls, motorized movements, and sensors.

Run air and gas lines: If your welding application requires gas or air, connect these lines securely.

6. Perform a Test Run

Inspect movement: Test the boom’s range of motion to ensure smooth, unrestricted movement.

...